Reading Arts Membership
Join Reading Arts Membership and get invites to exclusive events, priority booking and discounted tickets. Looking for South Street Membership?
More infoHexagon
Queen Walk
Reading
Berks
RG1 7QF
United Kingdom
The Hexagon is expanding with a brand-new Studio Theatre, designed by award-winning theatre specialists Haworth Tompkins. This transformative development will create much-needed performance and rehearsal space in Reading, while placing sustainability and accessibility at its heart.
The project will empower more diverse programming, attract new audiences, and strengthen The Hexagon’s role at the centre of the emerging Minster Quarter.
Located on the lower level, shared by both venues:
Set across two levels:
The new studio sits on the footprint of former backstage and service areas, replacing them with purpose-built, modern facilities.
The Studio Auditorium will offer:
Up to 200 seats or 300 standing
A striking new bridge from Queen’s Walk creates step-free access to:
Key architectural features include:
The project replaces the building’s ageing gas boilers with a low-carbon heating system:
Additional sustainability measures include:
The design is targeting BREEAM Excellent, a leading global sustainability standard.
The new architecture carefully balances old and new:
The planting on the bridge creates an open, welcoming approach that gives the Studio its own identity within the Hexagon campus.
This area is designed to work hard all day and evening.
When performances are on:
During the day:
Work has started to create Reading’s newest theatre.
The first stage of the work involved the demolition of the backstage area, dock and stage door area by our partners Feltham Construction Ltd. The construction has started on the Studio Theatre, with the scheme progressing well and due to be delivered Spring 2027.
The area off Queen’s Walk will be transformed into a cutting-edge, intimate 200-seat, 300 standing theatre perfect for comedy gigs and bands. Seating can be removed to create a standing space for 300 people, and there is a gallery with more seating on the first floor.
The new building will also have superior backstage facilities for performers and crews and an upgraded technical area which will attract quality productions of all sizes.